Mission critical MEP engineering · since 1987

Mission critical power and cooling for the AI era.

High-density retrofits, new builds, and on-site power plants. Designed and commissioned by senior engineers who have been doing it for decades.

  • 1987Founded. Privately held, second generation
  • 17States where we are licensed
  • 5 PEsEach with 20+ years of experience
  • 90%+Of our projects are from repeat clients
What we engineer

One discipline: power and cooling that cannot fail.

From 1 MW life-cycle upgrades to 150 MW campus planning. Most of our work is at sites that have to stay online while we change them.

AI and high-density data centers

Liquid-cooled halls, CDUs and rear-door heat exchangers, and GPU rack power distribution at 140 kW per rack and beyond.

Live data center upgrades

New capacity, cooling and UPS installed and cut over in operating facilities with no interruption to critical load.

On-site power and medium voltage

Generator and paralleling plants up to 40 MW, campus 13.8 kV distribution, peak shaving and microgrids.

Central plants

Chilled water plants, economization and controls, replaced in phases while the load they serve stays up.

Why FEA

We commission what we design.

Our engineers write the switching procedures and run the integrated system tests, so our designs are built to be maintained without an outage. What we learn in the field goes into the next design, and many of our clients have kept us for more than twenty years.

Trusted by

Clients for 10, 15 and 20 years and longer.

Financial services, media and entertainment, healthcare, defense, retail, technology and higher education, all with the same need: facilities that cannot go down.

Financial servicesGlobal asset manager
ConfidentialInsurance and financial services
Fortune 50Health insurance
AI hyperscalerGPU data center campuses
Fortune 50Media and entertainment
ConfidentialBroadcast media
Fortune 100Retailer
Fortune 50Global logistics
Fortune 100Aerospace and defense
Top 10Research university

Rankings from the 2026 Fortune 500 and the QS World University Rankings 2027. Client names withheld.

A project with a hard deadline and no tolerance for downtime?

Talk to an engineer